ULTIMATELY WHO IS RESPONSIBLE TO REMOVE CORRUPTION FROM THE SYSTEM OF.GOVERNANCE IS BECOMING A QUESTION OF REPLY ?

Who is responsible for removal of corruption and bring transparency and accountability in the administration is becoming a question before the all living in the society and circle and working for the good governance and charter of the public accountability as such in a decision taken by the SIC vide number-5509 dated 11-12-2024 the SIC failed to follow online hearing of appellant held on 29-11-2024 and placed on the records of the e-Mail for taking cognisance of the decision on the merits but no review taken for the welfare of the people of area and circle. It is particularly mentioned here that number of appeals and the representations furnishes before the PIO cum Executive Engineer I&PH Jhandutta for issue complete information in the interest of justice for the common man and do needful under law code manual, for which said information in person obtained from the PIO to access correct, complete and accurate vision of the demand under public utility where code and specifications totally ignored by the executing agency working at the site of the work however it is regretted for the correct vision of the information and improvement in the work and conduct of the works furnished by the construction agency, in this behalf. Appellant processed case file of the demand under public utility through FAA cum Superintending Engineer I&PH Circle Bilaspur for this cause of the correct, complete and accurate vision of the code and specifications but the department took no cognisance of the wrong interpretation of the code for consideration ignored for the design and consideration of the parameters of structure made and paid to the construction agency. Under these conditions and circumstances the appellant tried his level beat to improve the structure in load for consideration and assumption for the required stability of structure (Retaining Wall) constructed in the Sukkar khud approach road to Irrigation scheme of the Malari Balhseena area, however it is found that there is no technical check and supervision of the construction works and wrong interpretation of the code for consideration going on the such sites for the improvement of infrastructure, even there is no appropriate remedies for the such illegal faulty construction and the structure may collapse if loaded backfill is submerged as designed for the earth pressure and the hydrostatic pressure, where in it is necessary to follow the design parameters of the function of mass or concrete or masonry provided for the dead weight to give stability against the thrust of retained earth. The unit stresses in concrete or masonry are very low and the structure is so proportioned, where no consideration has been given to the bottom width and the top width of the design requirements prefixed by the tensile stresses, so developed in such type of manipulation for the drawing and structure, where there is no vision of the theory of structure and designed resistance. The higher authorities are on the other hand taking no cognisance of such lapse, even Assistant Engineer of the department and the Executive Engineer telephonically informed for the corrective measures of the wrong doings at site of work by the local public in this behalf is proof and evidence and the press media also took cognisance of the demand under public utility however there is no vision of the function of the codes for consideration and contrary behavior of the department of I&PH before the SIC is surprising, even remained present for the online video conferencing on the date of hearing but no hearing was found necessary by the staff on duty is a matter of sore grave concern :-- Er Fateh chand Guleria phone number 9459334377.

No comments:

Post a Comment