More than seventy percent of the work force of access to artificial intelligence controlling the system of modern technology in India, however it must be ensured that the system is not tampered with or mishandled is too necessary for the operations of this skill development programme where user codes and passwords should be given to the regular work force of the artificial intelligence and the software should incorporate checks to prevent unauthorized access to data and to prevent unauthorized changes in the data and for this necessary technical advice of the system designers consultations must be secured for the correct and safe restrictions on the access to essential security of the data . It is also necessary to adopt the feasibility study approved by the user department as per study of the report on artificial intelligence, as required in order to prepare "Systems Specifications Report" which includes identifying report contents (outputs) , frequency of reports and the presentation of the reports, identifying Data requirements for the purpose, ie identifying data sources, the nature and type of the data. Preliminary identification of the outputs and the associated inputs have to be done by the office/Department (user) , since they alone know what information they need and how useful it is likely to be. They must be available for the link outputs with the raw data, only after this identification, discussion should be held, in order to identify additional useful outputs possible from the same inputs as a result of the suggestion based on the logical system of design and it is to be realised for the required analysis of the data produced for the final observation and presentation after analysis done to establish logical procedures required for the validity of the input data and also to protect and produce the desired outputs from the available inputs. The report on the artificial intelligence realising alternative approaches to meet the correct objectives of the available proposed system and required benefits of the system for service, where its cost must be included for the design and scope as well as required development, implementation and maintenance of the system for benefits in the real sense of accuracy and correct figures generated by the specialists for further information to meet the states object of the demand under public utility in the concerned department of the user, responsible for the correctness and completeness of the analysis made for the accurate information and objective for the database application/presentation for the important components of the logical system design approved by the said department/office/user.
.
No comments:
Post a Comment