Design of structure is essential and by way and virtue of which the road works are also designed in the field of consideration design of sight distance as well as horizontal and the vertical curves failing which it would create problems for smooth driving of the vehicles and may help to accident more over ruling gradients are very necessary in the hilly ares In accordingly an application was furnished with the HP government Shimla department of the PWD regarding to consider the case of improvement and widening to the Ghumarwin Talai Badsar road and for which a personal hearing was also arranged with the special secretary PWD madam Priyanka Basu and detailed report as furnished by office and authority further referred to the Chief Engineer HPPWD Hamirpur for preparing of the estimates and improve the portions where it is essentially required In this connection further it is submitted that portion from village Kathuin to Daslehra is narow and improvement of cuves as well as sight distance and grade revamping at the accute narrow escape urgently required and for which an application along with reply of the RTI issued and respond by the NHAI vide number 11011/21/2015/RTI/PIU-SML/1570 dated 20-09-18 has been furnished with the endorsement to Superintending Engineer 10th circle HPPWD Bilaspur on 07-06-2019 so that pending works of Ghumarwin division may be started again as such the NHAI has refused the status of NH to this MDR till date of now so necessary repairs as well as improvement of the existing curves is executed by the PWD authorities and for which compliance report if delayed would be the sole responsibility of the department as such the above matter is also under process and consideration with the honourable high court of HP Shimla and will be heard on 25-06-2019 where in queries raised are replied by the NHAI.
No comments:
Post a Comment