Design of structure is essential and by way and virtue of which the road works are also designed in the field of consideration design of sight distance as well as horizontal and the vertical curves failing which it would create problems for smooth driving of the vehicles and may help to accident more over ruling gradients are very necessary in the hilly ares In accordingly an application was furnished with the HP government Shimla department of the PWD regarding to consider the case of improvement and widening to the Ghumarwin Talai Badsar road and for which a personal hearing was also arranged with the special secretary PWD madam Priyanka Basu and detailed report as furnished by office and authority further referred to the Chief Engineer HPPWD Hamirpur for preparing of the estimates and improve the portions where it is essentially required In this connection further it is submitted that portion from village Kathuin to Daslehra is narow and improvement of cuves as well as sight distance and grade revamping at the accute narrow escape urgently required and for which an application along with reply of the RTI issued and respond by the NHAI vide number 11011/21/2015/RTI/PIU-SML/1570 dated 20-09-18 has been furnished with the endorsement to Superintending Engineer 10th circle HPPWD Bilaspur on 07-06-2019 so that pending works of Ghumarwin division may be started again as such the NHAI has refused the status of NH to this MDR till date of now so necessary repairs as well as improvement of the existing curves is executed by the PWD authorities and for which compliance report if delayed would be the sole responsibility of the department as such the above matter is also under process and consideration with the honourable high court of HP Shimla and will be heard on 25-06-2019 where in queries raised are replied by the NHAI.
Vision RTI success in completion to the bus stand Ghumarwin
A RTI application was furnished before the PIO office of DM HRTC Hamirpur which was related to providing cover over stairs not arranged for office cum passengers rest room at Ghumarwin district Bilaspur HP As such matter referred to Dy DM Bilaspur from Hamirpur vide number 7289dated 3-2-2017and application under E samadhan also furnished to GM hrtc Shimla vide number TPT 2017 16dated 12-02-2017 to arrange for the mumty so that rain water may not enter in to the premises of verandah in ground floor In reply to applicant PIO cum DyDM Bilaspur informed that said bus stand has been inaugurated since 14-2-1988 by the honourable CM and matter regarding construction of cover over stairs opening taken in hand vide letter number dated 17 -02-2016 Applicant personally visited office of DM Hamirpur to arrange for the sanctions of pending works twice and there after DyDM informed applicant vide number 7965dated 15-3-17 and number 495 dated 21-3-17 that necessary estimate has been prepared and processed to Sr Executive Engineer for further necessary action in the matter Accordingly sanction was furnished by the Chief Executive officer HP BSMDA Tutikandi Shimla however DM HRTC Hamirpur filed complaint against applicant with SHO Ghumarwin that applicant is unnecessary blaming and charging my duty and conduct and behaving in the misbehavior tone for which applicant was called by the SHO Ghumarwin on 18-05-2017 to explain the position and record statement and verification of the facts finding details no FIR was registered Further it is submitted in the matter that immediately the HRTC authorities started the pending works and constructed mumty with cover along with additional accommodation for rest room which was a necessitated necessity of that complex and demand under public utility has been accepted and the incomplete works completed after completing all codal formality is a success of RTI vision too reported by the HP police in this regards is matter of pleasure and cooperation to the RTI activist.