HIGH WAY ENGINEERS MUST HAVE DISCUSSION AS REQUIRED FOR THE PLANNING AND DESIGNING OF NEW PROJECTS BEFORE COMPUTATION OF THE OBJECTIVE

Road project estimates prepared for the working plan must have sufficient data required to bring correct execution of the various sub head of works for which various publications of the engineering and too the Indian road congress pertinent to the larger structures laid down for detailed design procedure must be consulted to bring accurate information and technology on the captioned subject matter deliberation required to be maintained by the department on the record of the detailed description made by the required project orientation scheme for which the sufficient data before designing is prepared and collected from the field which includes the flood discharge of rivers catchment area and rainfall from the conveyance factor and slope of the channel and from flood marks on existing structures outlined must be reviewed for the suggestions made by the previous records and proposed for the future course of action plan deemed necessary for the design of various bridges and culverts .In addition to this various papers and the journals of the Indian road congress have also been released by the competent higher authority for discussion and objective of the authors preparing the documents to help the highway Engineers in the country to do the planning and design for road projects correctly and expeditiously.

No comments:

Post a Comment