NTPC TOO RESPOSIBLE TO FOLLOW PATTERN STANDARD OF BBMB AND ISSUE NECESSARY FUNDINGS REQUIRED FOR THE PLANTATION AND CHECK DAMS NECESSITATED BY THE CATCHMENT AREA OF KOL DAM PROJECT EXISTING IN BILASPUR HIMACHAL PRADESH.
It was an occasion while visited the Kol dam site of power generation and transformation on 3-12-2022 for which the RTI activists Association Registered number HPCD 3552 take permission of the administration of the NTPC responsible for the welfare of society and circle and doing the needful under law code manual prefixed by the Government of India and the state government of Himachal Pradesh too responsible to watch and protect the safety measures of the people of sorroundings living around the lake existing in village Harnoda and the Bout Kasol and facing the problems due to land sliding and danger of the erosion by way of catchment area tributes joining the main stream water in Lake of the Kol dam project maintained by the NTPC .It has been observed during the course of visit to place covered by the water existing in the lake that the government and the NTPC authorities are responsible to follow the decision of the Bhakhra Dam project maintained by the BBMB and issue necessary fundings required for the plantation of the dry hills along the lake and too construct the check dams in tributaries existing in the periphery of the catchment area covered by the Kol dam rehabilitation center for the water inspection and verification of data reports maintained by the study of protocol mentioned in the check list of the department for welfare of society and circle and doing the needful under law code manual prefixed by the government and the constitution of India in this behalf for which the RTI welfare Association Registered number HPCD 3552 is working to verify the facts and figures at the site of work and too processed by the NTPC in the interest of justice to the people of area and circle living around the lake of the Kol dam project maintained by the government of India and too by the state government of Himachal Pradesh list by way and virtue of which it is necessary to follow the instructions and guidelines of the BBMB and take cognizance of the work of plantation and check dams required for the strengthning of the hill terrains and protection of silt factor variation adversing affect against the interst of local people and the power generation maintained by the NTPC by way of maintaining the water level /head existing in the lake of the Kol dam project maintained by the NTPC with inspection through their professional services and idealogy prefixed by the study of protocol mentioned in the technological solutions and services for the good tolerance and value of factor of safety against the danger of consideration and reports based on the captioned subject matter deliberation required to be exercised and used by the BBMB in case of the similar issues and matter deliberation required to be maintained by the NTPC in the similar circumstances of the explanation and verification of site at the project reports processed under RTI act publications before the competent higher authority,since long however issue and matter still pending for facts finding report is a matter of sore grave concern even though the BBMB providing necessary fundings required for the plantation and check dams is proof and evidence on the record of the state government of Himachal Pradesh and too the GOI .
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment