CONTRACTOR OF THE DEPARTMENT MUST PROVIDE DRAWINGS OF THE SCHEME/WORK ON DEMAND TO AN AUTHORISED REPRESENTATIVE OF THE ORGANIZATION.




It was an occasion today on 22-9-2023 when the VP Gram Panchayat Gandhir Teh Jhandutta Distt Bilaspur Himachal Pradesh raised an issue of the Retaining wall under construction for approach road to water supply scheme Malari Balhseena where no design &Scope of the work taken in hand by the contractor of the Irrigation and public health department and below standard material used for the construction of said Retaining wall for which sample of the material may be checked at the circle level laboratory of the material testing. The issue and matter have been already brought to the notice of the Pradesh Congress Committee GS Shri Vivek Kumar by the representatives of the GP Gandhir on 20-9-2023 and inspection at site of work too conducted by the all to improve work and conduct of the work under construction however no cognisance taken by the contractor for which the matter has been brought to the notice of the Executive Engineer I&PH Jhandutta on 22-9-2023 when said contractor of the work denied to follow the improvement of required specifications and code for construction and abused to the visiting group of members for inspection for correction of the remedial measures. While contacted the Executive Engineer of the department he further issued directions to his Assistant Engineer for visit the site and take cognisance of the complaint furnished by the people of area and circle which includes Shri Vijai Kaushal VP Gram panchayat Gandhir teh Jhandutta Distt bilaspur and Shri Mehta leader of farmer union and press representative Shri Amit prashar. Shri Shashi Paul Assistant Engineer of the department visited the site of work and took notice of the complaint before the public representative of the constituency and too the EE of the department and accepted to rectify the erroneous item of works pointed before the public representative however the Assistant engineer of the department assured to stop the work till required cotrection, where no set of drawing and material consumption register was operated by the contractor and the department even the supervisory post of the mortar mate found present at the site of work but the labourers were taking no cognisance of the said supervisor of the department and in contrary mis behaving with the inspecting persons asking for the coreective measures due to which the matter brought to the notice of the higher authorities responsible for the good governance and accountability under law code manual:--Er Fateh Chand Guleria, Director, RTI welfare Association Registered number HPCD -3552 Bilaspur Himachal Pradesh.

No comments:

Post a Comment