Showing posts with label RD department. Show all posts
Showing posts with label RD department. Show all posts
GOVERNMENT OF STATE AND DEPARTMENT OF RURAL DEVELOPMENT MUST ISSUE NECESSARY DIRECTIONS TO PANCHAYATI RAJ DEPARTMENT FOR C/O HUME PIPE CULVERTS OVER THE AMBULANCE ROADS OR NECESSARY FUNDS MAY BE TRANSFERRED TO THE STATE (PWD) FOR DOING NEEDFUL.
It is a matter of fact and concern that where a defined channel doesn't exist and the natural velocity of flow is low, it is economical to design a hume pipe culvert or a number of pipes may function with the inlet submerged as per the discharge, as such the flood water starts heading up at the inlet, the velocity through the barrel goes on increasing and this continues till the discharge passing through the culvert equals the discharge coming towards the culvert. When this state of equilibrium is reached the upstream water level does not rise any higher. For a given design discharge the extent of upstream heading up depends on the ventway of the culvert. The latter has to be so chosen that the heading up should not go higher than a predetermined safe level, the criterion for safety being that the road embankment should not be overtopped, nor any property damaged by way of submergence and the fixing of this is the first step in the design and scope of the proposed hume pipe culvert. It is essential that the HFL in the outfall channel near the exit of the culvert should be known. This may be taken as the HFL, prevailing at the proposed site of the culvert before the construction of the road embankment with some allowance for the concentration of flow caused by the construction of the culvert. Keeping in view the above guidelines RCC pipe culverts with single or two pipes of one meter dia and first class bedding for heights of fill varying from 0.6 metre to 4.00 metre may be proposed as per the cross section at site of the work however it is regretted to point the standard estimate of the RD department amounting to rupee three lacs proposed for the ambulance roads in the rural areas and denying to take work in hand with the observation that a some of rupee ten lacs in addition to rupees three lacs are additionally required, even though there is no reason to deny the proposed works keeping in view the phase wise construction of the quantities for the construction of bedding and the curtain walls along with laying of class NP-3 pipes (ISI) mark is a standard for the first phase construction and if there is any increase in the quantities of the standard estimate prepared by the RD department amounting to rupees three lacs that may be considered as a measure of the second phase work required to complete the said construction of hume pipe culvert right from 0.6 mt to 4.00 mt heights of the fill for raising the road levels to improve the existing ruling gradient of the said road for which the panchayati raj department taking crores of rupees from the GOI in lieu of MGNREGS however no appropriate provision of the culverts are taken by the department to make these roads all weather, even showing the standard estimate of three lacs on demand under public utility however on the other hand denying to construct such crossings of the road net works of the ambulance roads proposed by the panchayati raj department. Keeping in view the above position of the incomplete works of the RD department number of representations have been submitted to the competent authority of the department for doing necessary provision of the second phase construction required for the wing walls and the embankments etc but taking no such provision for the construction of Culverts , as essential for the all weather road net work of the ambulance roads, even though the works of the cement concrete laying on the top surface of the such roads continued in the phase work of the patches for laying boulders and the cement concrete over boulders. Necessary complaints have been made before the respective Chief Secretary of the state Government to do needful under law code manual prefixed by the Government of India, MGNREGS, Division, New Delhi but there is no clarification till date of the demand under public service/utility and the PIO cum Secretary (RD) has replied on the captioned subject vide memo dated 3-1-2025 that the representation furnished by the applicant before the respective Chief Secretary of the government is not available in the office and no information could be supplied to applicant for which enquiry may be processed before the ombudsman of the district however there is no such provision in the district at present and the Gram panchayats are taking no cognisance of the orders of the Programme officers and the Director of the Mahatma Gandhi National Rural Employment Guarantee Scheme appointed for the redressal of grievances of the general public. Keeping in view the above position of the construction of roads net work related to the ambulance roads of the Rural department the government is responsible to arrange for the completion of the incomplete works or hand over such works of the RD department to the Public Works Department, so that completion of the incomplete works may be done and said roads may be prepared all weather for the demand under public utility :-- Er Fateh Chand Guleria, Director, RTI Welfare Association, registered number HPCD 3552 Bilaspur Himachal pradesh, phone number 9459334377
RD DEPARTMENT AND THE PANCHAYATI RAJ EFFECTIVE IMPLEMENTATION OF MGNREGA SCHEMES WORKING ON STRENGTHENING CAPACITY BUILDING, MUST BE HELD RESPONSIBLE FOR UTILISATION OF CERTIFIED STRUCTURE, BEFORE RELEASING THE NEXT ALLOTMENT OF SCHEMES/FUNDING.
All the funding approved and released by the Government of India and the state governments for Mahatma Gandhi National Rural Employment Guarantee Schemes/Act for the welfare of community people , as well as strengthening Capacity Building and awareness generation for the effective implementation of the RTI Act, improving transparency and accountability in government through effective implementation of the RTI act in the previous years, must be certified by the statement of the physical achievement and demand under public utility but it is regretted for the wrong act play of funding without taking into consideration that previous years fully utilized certification of the such works which are required to be verified by the MGNREGA and its authority for the release of funding and once the estimates of expenditure are approved as reasonable and the grant furnished on the basis of these estimates, they shall not be modified by the institution without prior approval of the sanctioning authority of the amount furnished for the work. A number of complaints are being verified on the spot during the inspection and the social audit that works are incomplete since the long however the RD department taking no cognisance in the matter even number of complaints furnished for completion of the incomplete works. As such the programme officers and the Director of the MGNREGA as well as Secretary of the RD department are being apprised to take cognisance of the such lapse where there is no public utility of the funding but the department taking no remedial measures for appointing the ombudsman on the captioned subject of demand under public utility required for the good governance and accountability in this behalf list by way and virtue of which matter too brought to the kind notice of the respective Chief Secretary of the state Government for redressal of grievances as per instructions of the Government of India's instructions, time to time issued for the action against the defaulters but issue and matter pending before the Secretary RD and no action has been taken for the needful under law code manual prefixed by the GOI in this behalf:-- Er Fateh chand Guleria, RTI welfare Association registered number HPCD 3552 phone number 9459334377
DEPARTMENT OF RD AND THE PUBLIC INFORMATION OFFICER OF THE DEPARTMENT RELUCTANT TO SUPPLY INFORMATION RELATED TO THE PENDING CASE VERIFIED BY THE DEPARTMENT OF ADMINISTRATIVE REFORMS GOVERNMENT OF HIMACHAL PRADESH SINCE COMPLIANCE DATED (8-9-2022) .
A disposal of request for status report on the captioned subject of Social audit has been made before the Public information officer department of RD Government of the Himachal pradesh Shimla on 30-11-2024 for taking cognisance of the Administrative reforms organisation memo number Per (AR) B(12) -2/2015 dated 8September 2022 but on the telephonic deliberation made for necessary review and reexamine of the pending issues related to Gram panchayat Gandhir and Balhseena, jhandutta block of the Bilaspur Himachal pradesh, related to incomplete works and delay and dereliction of duty by the APIOs concerned asked under the RTI act adjudication for completion of the hume pipe culverts in village Kathuin and Karaha Nallah in GP Gandhir, the matter referred for the enquiry under law code manual prefixed by the MGNREGA, scheme the PIO seems to be reluctant for the action taken report on the captioned subject of Social audit preferred by applicant and referred by the Department of the Administrative reforms government of Himachal pradesh Shimla. Under these conditions and circumstances it is difficult to furnish the facts finding reports of the pendency of cases already sanctioned by the Competent higher authority for completion of the works of the Hume pipe culverts. On the other hand the department of the RD is clearly responsible for taking cognisance of the letter referred by the department of the Administrative reforms since 8-9-2022 where in huge correspondence made with the BDO jhandutta and the Deputy Commissioner Bilaspur Himachal pradesh is proof and evidence on the record of all concerned but the Department of RD reluctant to take cognisance of the letter processed by the respective Chief Secretary of the Government of Himachal pradesh , so referred by the office and registered vide Diary number1696 dated 18-11-2024.As such the public information officer of the department is both ways responsible to attend the pending case of social audit report and demand its compliance from the FAA as well as the Head of the department under section 6(3) of the RTI Act adjudication but the Public information officer seems to be reluctant for referring case to the HOD where action as due in the pending case must have vision under section 18to 20 of the RTI act adjudication being responsible to follow higher authority and refer case to lower level of the demand under public utility but destroying the information of social audit report mala fidely and trying to issue misleading information on the captioned subject of demand under public utility already placed before the entire department for doing needful in the interest of justice to the community people demanding their benefits from the higher authority under law code manual prefixed by the Mahatma Gandhi National Rural Employment Guarantee Scheme/Act since very long but in vain and facing delay and dereliction of duty for redressal of the grievances time to time raised before the all concerned for review and revision of the commitments made by the MGNREGA/Scheme for the fruitful utility of the incomplete works, still incomplete since very very long :- Er Fateh Chand Guleria, Director RTI Welfare Association registered number HPCD 3552 Bilaspur Himachal pradesh phone number 9459334377and 7814966336
Subscribe to:
Posts (Atom)