Showing posts with label CBR. Show all posts
Showing posts with label CBR. Show all posts

THICKNESS OF THE PAVEMENT INCREASED FOR HEAVIER LOADS AND LARGER TOTAL VOLUME OF TRAFFIC, AND THE COMPUTATION OF TRAFFIC FOR CBR IS NECESSARY.

Recent rains and intensity of rain fall occured in the Hilly areas of the state of Himachal Pradesh has shown that the widening of hill roads disturbing the system of existing road net work facilitating the people of state and the tourists hubs like Manali and Narkanda Shimla Himachal Pradesh as well as Dharamshala creating problems to the life and liberty.As such it is necessary to avoid construction of more and more four lanes ,divided highways for which the state government and the National Highway authority of India must link this facilitation with the provisions of Two-lanes 7.0 metre carriage way and the 5.5 metre carriage way suggested for the Major District Roads.The development criterion should not be restricted for the welfare of society and circle however at the same time the government and the construction agencies of the roads must follow charter of the road capacity and the traffic count - equivalency factor for vehicles per day (both directions) before raising the classification of existing road capacity and it's improvement based on the CBR method of design and scope of the available methods of the pavement of design for which the CBR method has been found the most reliable as required for evaluating the strength of the sub grade (bearing capacity of the soil) and construction materials,as well as estimating the required thickness of pavement to satisfy a given loading.It is the most convenient and the widely used, though devised for the design of flexible pavements, the method is also used to determine the total thickness of a concrete pavement and granular base of sub -base .CBR is a measure of the load carrying capacity of any soil or granular material, which is expressed as a percentage of the load carrying capacity determined by a penetration test.Computation of traffic for the use of CBR is necessary for which the design is based on the total number of commercial vehicles per day in both directions multiplied by the Equivalency factor.Basic capacity of a traffic lane is the maximum number of passenger cars that can pass a given point on a lane or roadway during one hour under the most nearly ideal roadway and traffic conditions that can possibly be attained.The thickness design of pavement involves the interplay of several variables,such as the wheel load and it's impact effect, volume and character of the traffic expected to use the road, bearing capacity of the soil on which the road is to be built.When a wheel load is applied to the pavement,the intensity of stress reduces as the depth increases from the top of the surface.Thickness of the pavement is increased for heavier loads and a larger total volume of traffic.

DESIGN STANDARDS OF THE ROADS ARE RELATED TO ACCIDENTAL RISKS FOR WHICH COMPUTATION OF THE TRAFFIC FOR USE OF CBR IS NECESSARY.

Accidental risks are related to the accuracy of road design standards for which it is necessary to design the standard of roads as per the volume of vehicles accounted for the prescribed measures by the study of density of traffic as such the accident risk to pedestrians on a zebra crossing at a high speed intersection (average vehicle speed more than 35 km/hr)is more than twice the risk to pedestrians at a low speed intersection with identical road standard .The risk to cyclists seems to be much higher then to pedestrians in location with the same road design standard.Experiments conducted in this behalf indicate that there are twice as many accidents at cross roads than Y junctions at a speed limit of 50 km per hour and four times more at 80 km/hr .At cross roads there are twice as many accidents at 80 km/hr ,as at 50 km/hr .The effects of channelising the traffic flow results in a fifty percent reduction in accidents .Some Engineers however disagree about the worth of staggered intersections .It is considered that besides providing a poorer service,it is more dangerous for crossing the roads .The summit radii in the longitudinal alignments and the radii of bends in the horizontal alignment should be made as long as possible for changing the visibility conditions arising from the lower driving positions of the more modern cars that are coming up .The overtaking visibility distance should be provided on as a great percentage of the length of the road and as uniformly as possible.It is necessary to have computation of traffic required for the use of CBR and distribution of traffic over the carriage way the traffic is considered in the units of the commercial vehicles.(1) Single -lane roads 3.75 Mt wide :-- The design is based on the total number of commercial vehicles per day in both directions, multiplied by two .(2) Intermediate width roads 5.5 Mt width :--The design should be based on the total number of commercial vehicles per day in both directions multiplied by 1.5 .(3) Two -lane Single carriage way roads:-- The design is based on 75 percent of the total number of commercial vehicles in both directions.(4) Four -lane Single carriage way roads :- The design should be based on 40 percent of the total number of commercial vehicles in both directions.(5) Dual Two lane carriage way roads :--The design should be based on 75 percent of the number of commercial vehicles in each direction and the distribution factor shall be reduced by twenty percent for each additional lane of the road .

CBR METHOD OF DESIGN IS BASED ON THE COMPUTATION OF TRAFFIC CENSUS

CBR METHOD OF DESIGN :-- A surface having a CBR of 100 percent is one in which a load of 1360 kg has to be exerted to drive in a cylindrical flate plunger with a base area of 19.3 square cm to a distance of 0.250 mm at the rate of penetration of 0.125mm per minute. The computation of traffic for the use of CBR over the carriage way considered in units of the commercial vehicles for different classification of roads:-- In the case of single lane roads 3.75 mt wide the design is based on the total number of commercial vehicles per day in both directions multiplied by two .In case of intermediate width roads (5.5 mt width ) the design should be based on the total number of commercial vehicles per day in both directions multiplied by 1.5 Two lane single carriage way roads the design is based on 75 percent of the total number of commercial vehicles in both directions. Where as four lane single carriage way roads are designed on the basis of 40 percent of the total number of commercial vehicles in both directions. As for as the dual two lane carriage way design of roads is concerned it should be based on 75 percent of the number of commercial vehicles in each direction and the distribution factor shall be reduced by 20 percent for each additional lane .