Showing posts with label traffic volume. Show all posts
Showing posts with label traffic volume. Show all posts

DUE CONSIDERATION SHOULD BE GIVEN TO THE EXISTING TRAFFIC VOLUME, AND PROBABLE GROWTH OF TRAFFIC IN ROAD NET WORK , AS REQUIRED FOR THE POSSIBLE CHANGES IN THE CLASSIFICATION AND IMPROVEMENT OF ROAD NET WORK.

Examination of data for traffic based on the captioned subject of purpose of design &scope, required for the test results of observation pavement deflection measurements the traffic is considered in units of heavy vehicles (Vehicles with a laden weight of 3 tonnes or more) per day, in both the directions in the case of two lane roads and in the direction of heavier traffic in the case of multi lane divided highways. Based on the present traffic volume, the design traffic, i e. the traffic expected at the end of the design year should be estimated. In preparing these estimates due consideration should be given to the existing traffic, possible changes in the road network and land use of the area served, and probable growth of traffic during the period of projection under consideration. It is considered appropriate that major through routes should be designed for at least ten years of life. Less important roads may, however be designed for a somewhat lower period based on growth prospects and the judgement. The traffic count figure used in the formula should normally be seven days average of commercial vehicles derived from 24 hour counts. However in exceptional cases where this information is not available, an average of three day count could also be used for the required analysis for the traffic projection on the main through routes.

CBR METHOD OF DESIGN IS BASED ON THE COMPUTATION OF TRAFFIC CENSUS

CBR METHOD OF DESIGN :-- A surface having a CBR of 100 percent is one in which a load of 1360 kg has to be exerted to drive in a cylindrical flate plunger with a base area of 19.3 square cm to a distance of 0.250 mm at the rate of penetration of 0.125mm per minute. The computation of traffic for the use of CBR over the carriage way considered in units of the commercial vehicles for different classification of roads:-- In the case of single lane roads 3.75 mt wide the design is based on the total number of commercial vehicles per day in both directions multiplied by two .In case of intermediate width roads (5.5 mt width ) the design should be based on the total number of commercial vehicles per day in both directions multiplied by 1.5 Two lane single carriage way roads the design is based on 75 percent of the total number of commercial vehicles in both directions. Where as four lane single carriage way roads are designed on the basis of 40 percent of the total number of commercial vehicles in both directions. As for as the dual two lane carriage way design of roads is concerned it should be based on 75 percent of the number of commercial vehicles in each direction and the distribution factor shall be reduced by 20 percent for each additional lane .

PAVEMENT DESIGN AND CONSIDERATION LAY -BYS REQUIRED FOR THE BUS STOPS

The design of a pavement is governed by the traffic density, ie the number of vehicles using the road during the peak hours and the maximum wheel load. The daily traffic volume is about 8 to 10 times the maximum hourly volume In addition to this the character of the traffic and the speed of the vehicles are also major consideration. The rate of traffic increase per annum is also to be considered and which may vary from ten to twenty percent in a developing country like India. The traffic Counts -Equivalency factor for vehicles per day both directions must be considered for the desired road capacity after due evaluation of the conversion into equivalent passanger car unit for counting and basic capacity of a traffic lane is the maximum number of passenger cars that can pass a given point on a lane or road way during the course of one hour for which the traffic capacity of two lane road at peak hours should not be more than 1500 passanger vehicles per hour. It is also necessary to provide lay-bye on important roads required for the temporary parking Bays should also be provided for bus stops for which a space of 30into 3 meters is sufficient for lay--bys . Thickness of pavement is increased for heavier loads and a larger traffic volume of traffic .