PREPARATION OF PROJECT ESTIMATES AND GENERAL TECHNICAL INFORMATION BASED ON THE DESIGN &SCOPE OF STRUCTURE IS NECESSARY FAR AS PRACTICABLE TO SUITABILITY.

Project estimates generally consists of history and report of the work , required as by the design and scope of the struck with reference to the demand by authorities ordering preparation of the estimate and other related correspondence on the captioned subject. It is also necessary to take cognisance of the previous history of the case and the work, scope of the work, cost how to be financed. The object to be gained by the execution of the work, explanation if any unusual features which require elucidation. The reason for adoption of the project and design in preference to the others. Availability of material and labour and the agency for the construction and the time allowed for the completions of the work of the project estimate (2) Design and Specifications and reasons why particular design preferred along with calculations for the design and relative costs of the material used (3) Estimate giving details measurements and statement of the quantity along with the general abstract of cost. The total estimated cost should be given separately for each item. In addition provision should be made in the estimates, required for the all incidental expenditures which can be foreseen and also for the following items, where necessary, Cost of land, sheds for the temporary work and duty as well as stores or hiring of go downs, huntments for workmen, pumping of water etc (4) The estimate should be based on the departmental schedule of rates and where any of the rates are not available in the schedule, analyses of rates are required to be attached with the estimates for check. Justification of said rates should be prepared for the approval as per actual market rates along with ten percent for the contactors profit. (5) It is necessary to prepare the line diagram of the standard drawing first by way of demand under approximate seating capacity in the case of buildings and rooms inclusive of passage and other requirements. In case of the bridges the span is required to be designed for the proposal of sub structure and super structure, according. Detailed drawings as required on suitable scales along with the site plans showing the position of cross section and other proposals are required for the clear vision of each section of the structure and height of the levels to be maintained.

THE COSTS FOR ESTIMATES MAY BE ROUGHLY SEPARATED ON THE BASIS OF PERCENTAGE OF THE TOTAL COST, HOWEVER ITEMS OF WORKS AND FIGURES RELATED TO LABOUR COMPONENTS ARE MORE OR LESS APPROXIMATE.

In general case of an ordinary type of building the cost of materials come to about 60 percent and the labour about 40 percent of the total cost of the whole building and this may be further sub divided as percentage of the total cost and it may be verified separately on the basis of the items of works. Further the amount of work that may be done by a skilled or an unskilled labourer puts in is very variable depending the skill of the man, his stamina, location, climate, timings and several other factors. There fore, the figures given above for the labour items are more or less approximate, even in the case of the buildings construction. The work done by a labourer in one day roughly analysed on the basis of the each items of the work and According followed for the percentage of the total cost of the building or other construction works, specifically depending upon the each item of the work and papers to be submitted with a project estimate, generally consists of the report detailing scope of the work. Reference of the authority ordering preparation of the estimate and other correspondence on the subject matter related to the, previous history of the case and the work, design &scope of the work, cost how to be financed, The object to be gained by the execution of the work. Explain any unusual features which require elucidation and the reason for adoption of the project or design in preference to others. Availability of material and labour and agency for the construction of work and time specified for the construction of the work including the completion report of the scheme for Specifications and design and reasons why particular design chosen. NOTE:-- In some departments rates are based on plinth areas or cubic contents of similar works previously built, but estimates framed on the basis of apologies from existing works are not very reliable and before this method is adopted the correctness and accuracy must be examined or otherwise the analogy should be carefully tested for selected portions of the works. In particularly analogies drawn from the small works should never be relied upon for the preparation of large projects. The detailed drawings as required on the suitable scale, including the site plan and cross section of the plan is too essential for the accurate lay out plan of the building and the structure for the project estimate, other than the buildings.

PROJECT ESTIMATES MUST HAVE PROPER ALIGNMENT AND THE PROVISION OF WAY SIDE EMENITIES

The road project estimates should contain the following information. REPORT:-- The Report should be brief but full of the important information which must be related to the survey conducted and must outline:-- Previous history of the road if any existing,or history of the proposal of the road ,it's present condition, topographical and the geological features, possible future developments of the sorrounding areas of the road ,rainfall and floods etc It is necessary to give the details of the proposed alignment,it's special features and justification for the selection of the Particular alignment.Necessity for any heavy banks or cutting proposed and why these could not be avoided . Details of gradients and curves with radii and where they are in any way unusual. Sight distance and the corresponding provisions made at horizontal and the vertical curves .Formation width with relations to the existing and future traffic. Land widths to the acquired, permanent and temporary acquisitions. Details of the masonry structures required to be built-- Bridges , culverts, causeways , drainage, Retaining walls ,Rest houses , boundary walls for which separate sub estimates should be prepared for the welfare of society and circle to follow future semblance of the provision made and created for the development of the areas covered by the road survey and alignment finalised by the department concerned