STATE GOVERNMENT RESPONSIBLE FOR PLANNING AND COLLECTING POWER (ELECTRICITY) AVAILABLE FROM WATER FALLS WITHIN TEN YEARS OF THE SCHEDULE FOR EASE OF ACCESS TO ESTABLISHING THE ECONOMICS OF ITS INSTALLATION.

Hydro power is available from the water falls and the HP is available in kilowatts ie discharge of water in cumecs multiplied by fall of water in metres According to the given formula hydropower to harness the potential electrician may be available by way of management of the revenues generated through free power available from the hydroelectric projects and the state of Himachal pradesh aiming to do needful as a policy decision of the projects maintained and started for the future welfare of the state revenues generated through hydropower potential and small hydro electric projects at various such points required to create a stable and supportive policy and the regulatory framework for the overall development of the state where state government may obtain twelve percent free electricity from the construction agency and some other local area funding for the welfare of local community people but it is regretted to point that number of such companies are not working as per the guidelines of the state Government and at present the electricity department is also demanding funds for the new projects and the government is interested for the private sector investment on the captioned subject of demand under simultaneous use of the overall development of the Industrial Revolution and ecosystem, where twelve percent free electricity would be provided to the state Government in addition to the other requirements of the demand under public utility and royalty charges for the electrical services by discharge of water fall required for the electricity generation from the site of work through collection of water and it's strategic planning and management and effective utilization of the revenue generated from the schemes and projects estimated for the future development and benefits for the state government and public utility, like employment and supply of electricity at the local ends. The Government of Himachal pradesh must do needful under provision made for the formula accepted by the employer companies and based on the analysis of facility of transforming electricity advantages for which petty companies may help the supply and distribution to other states , if said work of the projects allowed for the sub classification of ease to access economics of the installation through minor electrical services by way of departmental distribution and appropriate rating of the work done by each contractor of the sub classification for distribution to others in the line of connectivity, demanding such facilitation from the state Government for their use. The schedule of works going higher day by day and it is necessary to verify the present system of such power available sites of water falls, so that the work may be planned and estimated for the construction with in ten years and necessary benefits of the electricity generation may be assigned to the concerned companies or the Board of departmental distribution through power transmission made functional after estimating the water falls available in the river discharged of water in cumecs

No comments:

Post a Comment