DESIGN & SCOPE OF THE SCHEMES MUST HAVE METICULOUS STUDY OF THE FINAL REVIEW BROUGHT ON THE RECORD OF THE COMPETENT HIGHER AUTHORITIY IN CASE OF THE CHANGE IN DATA REPORT RELATED TO THE PRELIMINARY SURVEY AND INVESTIGATION AT THE SITE OF WORK.
Design and scope of the major works taken in hand by the agency for construction must have proper re-examine before it is started as such data collected from the site of work should also be co related with the data sheet on the basis of which the structure has been designed by the design Engineers .Study conducted by the group of members working on the captioned subject matter deliberation required to be verified under code for construction clearly indicating that many major projects are kept pending due to failure of the construction parameters prefixed by the design and scope of the said works and structure becoming defective due to wrong interpretation of the Design and scope of the field data collected from the site of work and based on the record however not found correct during the course of construction by the agencies responsible for the construction work for which no change could be made without the prior approval of the competent higher authority for which the Department of construction is responsible to issue necessary addition and alteration of the original data and do the needful under code for construction and design of the Structures however neither the such shortcomings are reported to the Design wings of the department nor the construction agencies could be held responsible for the verification of original record of the data report sheets collected from the site of work during the course of preliminary survey and investigation of the schemes and projects list by way and virtue of which the infrastructure created and constructed from the system of meticulous study of the design and scope brought on the record of the papers and too developed at the site of work could not be constructed as specified by the code and specifications for which the appropriate vision of the field data must be related to the original design papers on the basis of which the tenders have been awarded to the construction agencies by the government or the department concerned.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment