HEARING BEFORE THE FAA CUM SUPERINTENDING ENGINEER 10 TH CIRCLE HPPWD BILASPUR AND PART DECISION OF THE APPEAL BEFORE THE FAA ALONG WITH THE RELIEF SOUGHT.
Today on 18-5-2022 a RTI hearing was attended before the FAA cum Superintending Engineer 10 th circle HPPWD Bilaspur as was related to the restrictions of lay -bye space unabling vehicles to draw off the road for temporary parking used for bus stand Berthin ,Tehsil Jhandutta Distt Bilaspur Himachal Pradesh situated on the GTB road and a major district of the state .The PIO cum Executive Engineer HPPWD Jhandutta was also present on the occasion and the dealing hand and the Branch Superintendent was also present on the occasion .On the plea of appellant the FAA provided part informations related to point number 1and 3 and also ordered to the departmental officers /Officials to issue the remaining points informations to appellant with in a week time possitively .On the occasion of hearing a Complaint was also highlighted before the FAA cum Superintending Engineer 10 th circle HPPWD Bilaspur Himachal Pradesh to issue necessary directions to the all concerned working under his kind control regarding to sign by name letters and memos as related to the RTI act publications and too the RTS act adjudication for which department of the Administrative reforms has already issued notification on 23-12-2021 however some officers and PIOs are still reluctant to do the needful as demanded by the law code manual prefixed by the government of Himachal Pradesh and ignoring the instructions of the DOPT .On the request of the appellant the worthy FAA cum Superintending Engineer 10 th circle HPPWD Bilaspur Himachal Pradesh ordered the PIO cum Executive Engineer HPPWD Jhandutta Distt Bilaspur Himachal Pradesh not to continue further work of the Divider /spacer existing in the centre of the bazar portion and creating unnecessary hurdles to the vehicular traffic for which in the case of a Major District road only strips with painting may be provided to have function of the divider ,in case of the more clarifications the department may take advise from the IRC and other relevant authorities working for the design parameters at the level of the HOD more over Department is responsible to follow Design & Scope of every work and project before starting the construction work at the site of work , instead of the wrong interpretation of the description of measurements required for the purpose of preparing Detailed project Report of the work and the history sheet of the project orientation schemes against the status evaluation and improvement of the existing infrastructure required for the welfare of society and circle.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment