IT IS NECESSARY TO COMPLETE THE REMAINING WORKS OF THE INCOMPLETE (DPRs) AND ISSUE NECESSARY COMPLETION CERTIFICATES INTHE INTEREST OF USE BY THE SOCIETY AND CIRCLE .

An RTI application has been filed before the Block Development Officer Jhandutta Distt Bilaspur Himachal Pradesh against the practice of Gram Panchayat Gandhir Tehsil Jhandutta Distt Bilaspur Himachal Pradesh as not completing the civil works constructed by the Agency authorised to work on behalf of the Panchayat and through the Mahatma Gandhi rural development scheme for which the B/Wall constructed in Mata Khabri Devi temple Gandhir/Balhsina has been the issue however in addition to that a rain shelter constructed in Kathuin Chowk existing on the GTB road (MDR) is also an issue for highlights as neither any plaster work has been done nor the sitting arrangements provided by the department of RDD  responsible for the safeguards of the Structural equipment for which no railing has been provided by the agency and the work is not accomplished even it is mentioned on the plate that rupees 1.5 lac has been spent on the work done by the Panchayat Department .Under these conditions and circumstances it is necessary to protect the safety measures of the users and arrange for the railing and the sitting arrangements however the said work has been started with effect from June 2020 ,and a period of almost two years have been elapsed but no completion report has been furnished by the GP Gandhir Tehsil Jhandutta Distt Bilaspur Himachal Pradesh for which the BDO Jhandutta and the Project Officer must verify the facts and figures placed on the record and must issue funds to the Construction of the remaining work related to the Mata Khabri Devi ji temple and too related to the Rain shelter constructed in Kathuin Chowk existing on the Major District road started from Ghumarwin to Barsar (Hamirpur) HP .

No comments:

Post a Comment