CONSTRUCTION AGENCIES ARE RESPONSIBLE TO FOLLOW CODES FOR DESIGN AND CONSTRUCTION BEFORE TAKING THE WORK IN HAND.
Building codes and other relevant codes and specifications are required to be followed before taking the work in hand so that necessary parameters given and suggestions required to be followed must be verified at the site of work. Now a days construction agencies are taking no cognisance of the codes for consideration and multistorey buildings are constructed without taking into consideration the required parameters, even though such structures are heavier in weight and instead of multistorey there should be lightweight construction of wooden structure. Before starting the work of building infrastructures in hand it is necessary to prepare a road map and plan of the plot size requirements however people are ignoring these necessitated necessities of the codes for construction, even though plinth protection is ignored in the hilly terrains. Building code and scientific research of the soil under plot of building is a demand under study for the foundation design and verification of the bearing capacity of the soil however bo such requirements are fulfiled by the construction agencies even in case of the major buildings which is highly objectionable matter of fact and concern to be noticed by the government and the relevant agencies.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment