BUILDING INFRASTRUCTURE SHOULD NOT BE ALLOWED WITH IN THE HFL BY THE ADMINISTRATION.

Heavy rain water is flowing through the rivers and road surfacing as over and attain the current during



Heavy rain water is flowing through the road surfaces and rivers and damaging the road infrastructure including blockage of many more roads for the last three days.Many bridges collepsed and buildings existing with in the Highest flood level too in the danger .The Mandi and Kullu Manali area facing acute problem because of the River Beas which is out of control and creating problems to the citizens of the sorroundings however the administration is working for the improvement of situation and position and controlling the discharge at Pandoh dam .The Pandoh bazar is facing overflows because of the low bank profile and there is no scope of the retrogression of floods required to be subsides and the HFL velocity of the water is very high and may damage the building infrastructure constructed with in the HFL .The velocity of flood water becoming erosive and cutting the land profile over and above the HFL .As for as the natural streams are concerned the scouring action of the ongoing water flooded with the current regularly maintained by the floods is not so even in the straight reaches however damaging the land profiles over and above the HFL particularly at the bends because of the obstructions to the flow ,so it is not suggested by the building codes and other relevant instructions to construct any building infrastructure with in the HFL ,however facing problems due to circumstances created because of the heavy rains in the all over north India .

No comments:

Post a Comment